PYXIS Engineering Corporation |
PYXIS ENGINEERING CORPORATION 3839 Bret Harte Drive Redwood City, CA 94061-1115 TEL 650/365-2694 FAX 650/365-2695 NET tom ATpyxiseng.com |
Most projects begin with a specification. Here are some items that can be included.
1.0 SCOPE OF WORK
1.1 Purpose
1.2 Intended Use
1.3 Definitions
1.4 Responsibilities
2.0 GENERAL REQUIREMENTS
2.1 Applicable Codes and Standards
2.2 Workmanship
2.3 Material
2.4 Interchangability
2.5 Maintenance
2.6 Labeling
2.7 Design Approval
2.8 Training
2.9 Utilities
2.10 Painting
2.11 Installation
2.12 Cleanup
2.13 Interlocks and Safety Provisions
2.14 Fire Protection
2.15 Sound Level
2.16 Electrical
3.0 SPECIFIC REQUIREMENTS
3.1 General
3.2 Specific
4.0 INSPECTION & TESTING
4.1 Acceptance Test
4.2 Final Acceptance
5.0 DOCUMENTATION
5.1 With the Proposal
5.2 Status Reports
5.3 Approval Drawings
5.4 Installation Plan
5.5 Test Procedures
5.6 As-Built Drawings
5.7 Operating and Maintenance Manuals
5.8 Test Certificates